James Doyle
-
Project Manager
at
ACE Construction
Ace Construction managed over 850 submittals on a $48M ground-up residential project in Baltimore, Maryland. By using SubmittalLink, they cut submittal turnaround time in half and eliminated lost documents.

Challenge

  • Tracked submittals and RFIs via email and Excel
  • PMs and consultants missed updates
  • Field teams didn’t have access to latest drawings

Solution

  • Centralized all submittals, RFIs and drawings in SubmittalLink
  • Consultants could review and respond with one click, no login
  • Field staff got auto-notifications and mobile access

Results

  • Submittal turnaround time went from 10+ days to under 5
  • Entire project team worked off the same up-to-date set
  • Eliminated “lost in email” for critical documents

Challenge

On a $48M residential project in Baltimore, Ace Construction had to manage over 850 submittals over 14 months. Their team used a patchwork of emails, spreadsheets and PDF markups to track it all which quickly got out of control. Submittal reviews took weeks, consultants missed deadlines and field teams were building off outdated drawings. With schedules tightening, they needed a better way for document control.

Solution

SubmittalLink allowed project managers to log submittals in seconds, route them to the right consultants and trigger auto-notifications for responses. Consultants didn’t need an account to respond, just one click from their inbox. Drawings were version controlled and accessible to the field via mobile. The team also tracked overdue items and could follow up without digging through email threads. SubmittalLink was essentially a shared workspace for the GC, design team and subcontractors, without the complexity of a system like Procore.

Results

Submittal response time went from 10-12 days to under 5, including mechanical and structural packages that had previously stalled. Two potential coordination issues were caught during drawing uploads and flagged before they hit the field. Field superintendents got fewer calls asking for the “latest set”. For the first time, the project team had a single source of truth for critical documents, without changing how consultants worked.
“SubmittalLink let us run tighter projects without the overhead.”

— James Doyle, Project Manager, Ace Construction

Start managing your submittals and RFIs under a single hub